Energy monitoring per panel: minute-level load profiles, waste and performance indicators
In 2025 Cubit built a sub-metering system on 45 live distribution panels, with one-minute acquisition, measurement validation and load profile analysis. The system was designed to spot consumption outside production, reactive energy above the ARERA thresholds and drifts. The article separates the indicators that can be derived from electrical measurements alone from those that need production data. It discusses their use in energy management under ISO 50001 and Directive (EU) 2023/1791 and describes how Scope 2 emissions are calculated.

In this article
The utility meter measures the energy drawn by the plant as a whole. The aggregate figure does not attribute consumption to individual loads and does not separate process energy from the energy absorbed while the plant is idle. Nor does it show how loads move over the course of the day. There are two levers for reducing the energy footprint. The first is eliminating unproductive consumption, the second is reducing the specific energy per unit of product. Both require consumption to be attributed to the centres that generate it, with a time resolution matched to the dynamics of the machines. Sub-metering per consumption centre is the precondition.
In 2025 Cubit designed and built an energy monitoring system for a project under the ARTES 4.0 call funded by the Italian recovery plan (PNRR). The project is intended for a platform serving SMEs. The pilot installation covers 45 distribution panels across the two sites of an industrial laboratory, with single-phase and three-phase loads up to 600 A. The instrumentation was installed without taking the panels out of service and the acquisition period was set at one minute. Raw data reside on-premises and the dashboard presents them per panel and per plant. In what follows, “panel” means the measurement point. Where a panel feeds a single machine, the profile is that machine’s; otherwise it is the combined profile of the loads it feeds.
Per-panel acquisition at one-minute intervals, without a plant shutdown

A wireless energy meter housed in an external enclosure was installed on each panel. The meter acquires phase currents and voltages, active and apparent power, power factor and cumulative energy. A department gateway collects the readings and exposes them over an open protocol. The solution was chosen because it did not require taking the panels out of service and did not affect their certifications. Wireless transmission also avoided running signal cables through the departments. An on-premises acquisition service polls the gateways every minute and writes the measurements to a plant database. The value read is stored alongside any corrected value. A daily pipeline replicates new data to a cloud machine and recomputes hourly, daily and monthly aggregations, following the same architecture as the industrial IoT cloud platforms Cubit builds for its clients. The dashboard reads detail from the raw data and long periods from the aggregations, with no limit on the interval queried.
Time resolution and per-panel breakdown together determine which analyses are possible. When a panel feeds a single machine, the profile of a production day shows the moment of start-up, the steady-state draw and the residual in stand-by. With hourly sampling only the envelope would remain visible. The dashboard overlays up to four days of the same panel on a 24-hour axis. Comparing a production day, a Saturday and a shutdown day separates systematic behaviour from an isolated event.

Consumption analysis requires that valid zero readings be distinguished from unavailable measurements. For this reason the acquisition service records three separate states: gateway unreachable, meter disconnected and valid measurement. Field validation confirmed the need. Some panels also powered their own meter. Once de-energised they produced zero readings indistinguishable from zero consumption. From that finding came continuous uptime monitoring of every gateway. It is handled by a tool separate from the dashboard and is counted among the system’s availability indicators.
The waste made visible by the per-load profile

The per-load profile makes visible four categories of waste that the aggregate figure blurs together. The first is baseload, the draw of a machine during phases in which it is not producing. Auxiliaries, cooling pumps, panel air conditioners, pressurised hydraulic power units and control systems stay powered between shifts and at weekends. In the daily profile the baseload appears as the constant component beneath the work cycles. Expressed as active power and integrated over the idle hours, it quantifies the energy consumed outside production. The share of that energy that can be eliminated through scheduled shutdowns or low-consumption stand-by modes then has to be established. In the utility meter’s figure the component stays mixed in with process consumption.
The second is compressed air. Leaks in the distribution network cannot be heard above the noise of the shop floor. According to the US Department of Energy, in poorly maintained systems they reach 20 to 30% of the air produced. A regularly maintained installation stays below 10%. The diagnostic signal is the compressor restarting with the plant idle to restore pressure. Its night-time profile reveals consumption outside production and, under defined test conditions, contributes to estimating overall losses.
The third is reactive energy. Motors and transformers at low load demand it and the distributor charges for it. For non-domestic low- and medium-voltage users, the Italian regulator’s resolution ARERA 712/2022 applies a charge when, in the F1 and F2 time bands, reactive energy exceeds 33% of active energy. The threshold corresponds to a power factor of about 0.95. Above 75% (power factor below 0.8) the charge is increased. In the system built, the indicator is the share of the day during which a panel’s power factor stays below a configurable threshold. On the live plant the threshold is 0.8. Zero readings correspond to the machine being stopped and are excluded from the count. The figure shows which loads pull the power factor down and for how long. It thus provides a basis for assessing power factor correction.

The fourth is drift. A machine, for the same job, draws more than it did a month earlier. A worn bearing, a clogged filter or a cavitating pump show up in the power drawn before they show up as a failure. Comparing days with the same job brings out anomalies worth investigating for maintenance purposes too.
From waste to process
Once unproductive consumption is eliminated, the footprint falls further only by lowering specific energy. The routes are well known: more parts per cycle, shorter cycles, jobs moved to the machines with better efficiency, and stops that do not leave the machine waiting at full load. Process KPIs, however, require data from outside the metering system. That is the case for consumption per unit produced, energy cost per shift and the efficiency of a line. Units produced, shifts and processing phases come from the ERP or the MES and must be linked to the metered loads.
The project contract called for those KPIs. In the trial phase the dashboard was reviewed with energy sector consultants. Pending production data, the planned indicators were replaced with others computable from the measured quantities alone. The new indicators are consumption and emissions per load and per plant, the share of time with power factor below threshold, the day-to-day comparison and the uptime of the measurement system. The replacement touched not the architecture but only the application logic, because the quantities acquired were already the ones needed. It confirmed a simple rule. Computing and verifying a KPI presuppose the availability of the data that define it. In ISO 50001 terminology, energy performance indicators (EnPIs) are compared against an energy baseline (EnB). They must be kept separate from the availability indicators of the measurement system and from analysis functions such as the day-to-day comparison.
From kilowatt-hours to emissions

The emissions associated with purchased electricity (Scope 2 under the GHG Protocol) are obtained by multiplying the energy consumed by an emission factor in kilograms of CO₂ per kilowatt-hour. In the location-based method the factor is that of the national electricity mix published every year by ISPRA, the Italian environmental agency. The factor falls as the share of renewables rises; in 2025 they covered 48% of Italian generation. In the market-based method the factor derives instead from contractual instruments such as guarantees of origin, according to the GHG Protocol criteria. The factor changes over time. In the system built, the administrator enters it with an effective date and the calculation applies to each period the value in force at the time. The annual update thus leaves already reported months untouched. Emissions per panel and per plant follow from the measurements and the factor adopted. Every action on waste becomes quantifiable in tonnes of CO₂ as well as in euros.
The requirements of ISO 50001 and Directive (EU) 2023/1791
ISO 50001 structures energy management as a Plan-Do-Check-Act cycle. Energy policy, objectives, indicators, measurements, analysis and corrective actions follow one another in a continuous improvement that presupposes measured data. Directive (EU) 2023/1791 on energy efficiency ties companies’ obligations to average annual consumption rather than to size. The energy audit becomes mandatory above 10 TJ a year (about 2.8 GWh) and an ISO 50001-compliant energy management system above 85 TJ. Article 11 requires companies subject to audit to draw up an action plan with implementing measures for each technically and economically feasible recommendation. The implementation rate must be published in the annual report. In the case described, per-panel consumption is comparable between days and separated from periods when measurement was unavailable. That is the measured basis that audits and verification of interventions require.
The per-load profile quantifies baseload outside production, and the compressor’s night-time profile flags leaks in the air network. The per-panel power factor contributes to assessing power factor correction, and the day-to-day comparison brings out drifts. The historicised emission factor turns every kilowatt-hour avoided into CO₂ avoided. In the project described, Cubit handled the selection of instrumentation, the acquisition software and the processing of field data. The dashboard is the visible part of that work. The value lies in the measurement chain that feeds it.
Text prepared with the help of artificial intelligence and reviewed by Cubit.
What to take into the project
Before defining energy KPIs, check which quantities the measurement system really acquires and at what resolution, because an indicator stands only on the data that define it. The minute-level load profile per panel is the basis from which the analysis of consumption outside production, the assessment of interventions and the calculation of emissions all follow.
Want to know where your plant is losing energy? Compare requirements and available data with the Cubit team.